EPG has set up a complete established of high quality management method which is presented with superior inspection and check tools. Every procedure, each and every part, each and every operate in EPG is demanded to be completed one stage pursuing an additional, very carefully and cautiously, from content variety, reformation to manufacturing equipment, from factors warmth treatment method to automated assembly, from high quality control to merchandise inspection and tests and from purchase dealing to soon after product sales service. We also can style and make non-common products to meet customers’ specific specifications. Traits of Manual EPTT EPT 3ton / EPTT Block:
one, EPTT double pawl braking syatem.
2, EPTT go over protection.
three, LigEPTT weigEPTT sturdy development.
four, Minimal effort to lift maXiHu (West EPT) Dis.mum load.
5, Further thick asbestos free of charge friction discs.
six, Fully cast hooks are equipped with basic safety latches as stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd.
seven, EPT quality alloy load EPT.
eight, Zinc plate hnd EPT as stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd.
9, Sealed bearing(optional).
10, Exclusive hand wheel protect for XiHu (West EPT) Dis.Hu (West EPT) Dis. hand EPT.
eleven, Every single hoist is proof tested at 1.5 times of WLL up to 10t. one.25 times of WLL 20t-50t.
twelve, Complies with EC Council Directive 2006/42/EC EPTTry. AEPTE B30.sixteen, AS 1418.2.
13, G-eighty RUD load EPT from Germany or FEC load EPT from Japan(optional).
14, Constructed in overload protection system(optional)
15, Ability of EPT hoist: 3t
Specification of handbook EPT hoist:
Model | CHB005 | CHB571 | CHB015 | CHB571 | CHB030 | CHB050 | CHB100 | CHB200 | CHB300 | CHB500 | |
Capacity (ton) | .five | one | 1.five | two | three radic | 5 | ten | 20 | thirty | fifty | |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd Carry (m) | two.five | two.five | two.5 | 3 | 3 | 3 | 3 | three | 3.five | 5 | |
Running Test Load ( Kn) | seven.five | fifteen | 22.5 | 30 | forty five | seventy five | a hundred and fifty | 300 | 375 | 625 | |
Hard work Essential to Elevate Max. Load (N) | 231 | 309 | 320 | 360 | 340 | 414 | 414 | 828 | 828 | 828 | |
EPTroom(Drawn shut up) Hmin (mm) | 270 | 317 | 399 | 414 | 465 | 636 | 798 | 890 | 1380 | 2578 | |
No. of Falls of Load EPTT | one | one | 1 | 2 | 2 | two | 4 | 8 | 12 | 24 | |
Load EPTT Diameter (mm) | 6 | 6 | 6 | 6 | eight | ten | ten | 10 | 10 | 10 | |
Proportions (mm) | A | 131 | 140 | 161 | 161 | 161 | 186 | 207 | 215 | 350 | 406 |
B | 127 | 158 | 174 | 187 | 199 | 253 | 398 | 650 | 680 | 962 | |
C | 270 | 317 | 399 | 414 | 465 | 636 | 798 | 890 | 1380 | 2578 | |
hook opening | thirty | 28 | 36 | 33.5 | 40 | 50 | sixty four | 85 | eighty five | a hundred thirty | |
Internet WeigEPTT (kg) | ten | twelve | 19 | twenty | 27 | 45.five | 83 | 193 | 268 | 1120 | |
Added WeigEPTT for each Meter Added Lift (kg) | 1.7 | one.seven | two.3 | two.three | 3.seven | five.six | nine.seven | 19.four | 28 | 54 |
Other lifting equipments are also accessible: